Friday, 11 May 2018

Coast Live Project : REFLECTION - Week 8

                                                Week eight Summary

During week eight everybody started the production of the final garments . I have had finished all my toile and started on cutting my final fabric . I have also made embroidery for my bags. Exactly BAGS , I am making not one but two bags!!!!FUN!!!I was very excited to get the fabric for the bags embroidered as fast a possible and start on the final production but the embroidery machine was broken
At this stage everybody knows what they are doing and everyone is just carrying on with their work.
I have started cutting my final jumpsuit fabric and the bags.
I have decided to show  why did it take me so long to DO MY PATTERNS.  I was trying to achive the best fit by using the least amount of fabric possible . Both of the fabrics I am using for the Jumpsuit are digitally printed so i was trying to achieve the most efficient way to reduce the size of my pattern so it still looks drapey  but it uses less fabric .I have done a total of around 30 layplans and modification sets in order to achieve this .

Examples of lay plans calculations with the help of Lectra Marker Manager





Lectra Modaris simulations of the final Jumpsuit and bags







No comments:

Post a Comment